Skip Navigation

Oxnard Union High School District

Business Services

Graph, calculator and pen

SCHOOL BOND OVERSIGHT COMMITTEE

Full Text of Measure

Table of Contents

  1. List of School Facilities Projects to be Funded with Proceeds of Bonds
  2. Renovation, Upgrade and Major Repair of Existing Facilities
    1. Adolfo Camarillo High School
    2. Channel Islands High School
    3. District Office, Transportation and other Facilities
    4. Frontier High School
    5. Hueneme High School
    6. Oxnard High School
    7. Pacific View High School
    8. Pacifica High School
    9. Puente High School
    10. Rio Mesa High School
  3. Construction of New School Facilities
    1. High School #1
    2. High School #2
  4. Documents
    1. Letter to Auditor - Final Draft
    2. Annual Report 2012
    3. Annual Report 2011
    4. Measure H full text
    5. Revised Audit 2011
    6. Questions response from District
    7. 6 Site Visits Report

List of School Facilities Projects to be Funded with Proceeds of Bonds

back to top ↑

The Governing Board of Oxnard Union High School District has evaluated the district’s need for new school facilities toward reducing overcrowding and making upgrades to existing school facilities for health, safety and improvement of grounds and facilities.

Renovation, Upgrade and Major Repair of Existing Facilities

back to top ↑

Project costs for renovation upgrade and major repair of existing school facilities may include, but not be limited to, the following: repair and replacement of lighting and electrical systems; heating, air and ventilation systems; flooring, roofs, windows, wall systems; plumbing, painting, fixtures and accessories, communication, bell and fire alarm systems, security systems, fencing, site improvements; walkways, parking lots, landscaping, athletic facilities and handicap accessibility improvements.

Adolfo Camarillo High School

back to top ↑

Improve campus security, technology and accessibility for increased student safety. Repair and renovate plumbing, electrical and mechanical systems, and school facilities and grounds.

Channel Islands High School

back to top ↑

Improve campus security, technology and accessibility for increased student safety. Repair and renovate plumbing, electrical and mechanical systems, and school facilities and grounds.

District Office, Transportation and other Facilities

back to top ↑

Repair and renovate plumbing, electrical and mechanical systems, and facilities and grounds. Improve and repair security and communications systems. Expand garages and parking lots. Expand facilities due to student growth and increased state testing/reporting requirements.

Frontier High School

back to top ↑

Improve campus security, technology and accessibility for increased student safety. Repair and renovate plumbing, electrical and mechanical systems, and school facilities and grounds. Relocation of facility if required.

Hueneme High School

back to top ↑

Improve campus security, technology and accessibility for increased student safety. Repair and renovate plumbing, electrical and mechanical systems, and school facilities and grounds.

Oxnard High School

back to top ↑

Improve campus security, technology and accessibility for increased student safety. Repair and renovate plumbing, electrical and mechanical systems, and school facilities and grounds.

Pacific View High School

back to top ↑

Improve campus security, technology and accessibility for increased student safety. Repair and renovate plumbing, electrical and mechanical systems, and school facilities and grounds.

Pacifica High School

back to top ↑

Improve campus security, technology and accessibility for increased student safety. Repair and renovate plumbing, electrical and mechanical systems, and school facilities and grounds.

Puente High School

back to top ↑

Improve campus security, technology and accessibility for increased student safety. Repair and renovate plumbing, electrical and mechanical systems, and school facilities and grounds.

Rio Mesa High School

back to top ↑

Improve campus security, technology and accessibility for increased student safety. Repair and renovate plumbing, electrical and mechanical systems, and school facilities and grounds.

The project list assumes state matching funding from current and/or future statewide bond measures. Oxnard Union High School District will aggressively pursue state funding and other types of funding to maximize funding for projects on this list. Bond funds cannot be used for administrative salaries.

Construction of New School Facilities

back to top ↑

Project costs for the construction of new schools may include, but not be limited to, site acquisition, architectural design, engineering, site improvements, inspection and testing services, plan review fees and interim financing, furniture and equipment, science and technology.

High School #1

back to top ↑

District wide student enrollments currently exceed student capacity of existing facilities by an amount equal to one comprehensive high school. District will immediately begin process to add one high school.

High School #2

back to top ↑

Begin process to build high school #2 when student enrollment exceeds existing capacity by an amount sufficient to justify the construction of an additional school facility.

The project list assumes state matching funding from current and/or future statewide bond measures. Oxnard Union High School District will aggressively pursue state funding and other types of funding to maximize funding for projects on this list. Bond funds cannot be used for administrative salaries.